The Scope of Installation Testing
The first step is verifying the documentation status (Checklist 010). We confirm that all necessary manuals, electrical schematics, P&ID diagrams, and material certificates (such as the List of Materials for Customer Product Contact) are present and approved. We also execute a General Implementation check (Checklist 020) to ensure the machine is built according to the agreed safety and ergonomic standards.
For each specific cell in the assembly line, we establish a Hardware Configuration Baseline (Checklist 110). This involves physically verifying that the installed components-PLCs, servo drives, vision cameras, and pneumatic valves-match the Hardware Design Specification (HDS). Furthermore, we conduct a comprehensive I/O Label Check (Checklist 140) to ensure every wire and sensor is correctly tagged, which is vital for future maintenance. Crucially, all measuring instruments must pass a Calibration check (Checklist 040), ensuring that load cells and LVDTs have valid, traceable calibration certificates before any dynamic testing begins.
The integrity of the control system is paramount for 21 CFR Part 11 compliance. We establish a Software Configuration Baseline (Checklist 203) to document the exact versions of the PLC firmware, HMI application, and vision system software installed. We also verify the Messages List Baseline (Checklist 210) to ensure all alarms and warnings are correctly configured, and we document the Electrical Cams Configuration (Checklist 220) which dictates the precise timing of the servo-driven assembly steps.
The Value of the IT Baseline
Related Technical Resources