May 01, 2026

Installation Tests (IT): The Foundation Of A GMP-Compliant Assembly Line

Leave a message

Article Summary:

Before a machine can be tested dynamically, its static configuration must be verified. This article explores the Installation Tests (IT) phase of DROFEN MACHINERY's FAT protocol, detailing how we establish a secure hardware and software baseline to ensure seamless validation and GMP compliance.
 
In the highly regulated pharmaceutical industry, documentation and configuration management are just as important as the physical machinery. When an injection pen assembly line is deployed, the validation team must prove that the equipment installed matches the equipment that was designed and approved.
 
This foundational verification occurs during the Installation Tests (IT) phase of the Factory Acceptance Test (FAT). At DROFEN MACHINERY, our IT protocols are designed to establish a rigorous, documented baseline for both hardware and software, ensuring that the equipment is ready for the dynamic challenges of Operational Testing (OT) and subsequent GMP validation at the customer site.
 

The Scope of Installation Testing

 

Our IT phase is divided into General Checklists and Cell-Specific Checklists, ensuring every detail is captured.
 
1. Documentation and General Implementation
 

The first step is verifying the documentation status (Checklist 010). We confirm that all necessary manuals, electrical schematics, P&ID diagrams, and material certificates (such as the List of Materials for Customer Product Contact) are present and approved. We also execute a General Implementation check (Checklist 020) to ensure the machine is built according to the agreed safety and ergonomic standards.

 

2. Hardware and Calibration Baselines
 

For each specific cell in the assembly line, we establish a Hardware Configuration Baseline (Checklist 110). This involves physically verifying that the installed components-PLCs, servo drives, vision cameras, and pneumatic valves-match the Hardware Design Specification (HDS). Furthermore, we conduct a comprehensive I/O Label Check (Checklist 140) to ensure every wire and sensor is correctly tagged, which is vital for future maintenance. Crucially, all measuring instruments must pass a Calibration check (Checklist 040), ensuring that load cells and LVDTs have valid, traceable calibration certificates before any dynamic testing begins.

 

3. Software and Control System Baselines
 

The integrity of the control system is paramount for 21 CFR Part 11 compliance. We establish a Software Configuration Baseline (Checklist 203) to document the exact versions of the PLC firmware, HMI application, and vision system software installed. We also verify the Messages List Baseline (Checklist 210) to ensure all alarms and warnings are correctly configured, and we document the Electrical Cams Configuration (Checklist 220) which dictates the precise timing of the servo-driven assembly steps.

 

The Value of the IT Baseline

 

By meticulously executing and documenting these Installation Tests, DROFEN MACHINERY provides CDMOs with a solid foundation for their Site Acceptance Test (SAT) and Installation Qualification (IQ). This proactive, project-delivery approach eliminates configuration discrepancies early in the process, saving valuable time during site integration and helping to make your compliance journey great again.
 

 